Driven by Ultrasonic Motor with High Performance Tbm

NPD1500 SLURRY  PIPE JACKING Device PARAMETER

 

Item Description
2600mm  Railway Tunnels Pipe Jacking Equipment construction is the Underground pipeline design  which developped following   shield construction.   
It does not need call for the excavation surface area,And it can cross roadways, railways, rivers, floor properties, underground constructions and a variety of kinds of underground pipelines, and so forth.
With the help of the thrust of primary cylinder and intermediate jacking station between the pipes and other thrust pushing the tool pipe or heading machine (via the soil )from working well to the getting well and Raise up.At the same time,embed the pipes between the two wells ,In order to comprehend the non-excavated laying underground pipes. Avoid destruction of the city structures  and street targeted traffic congestion during construction
In the security of soil and environmental safety highlights its rewards.It is quite important for cities with weighty visitors, densely populated, with a lot of terrestrial properties and sophisticated underground pipelines.It will produce a clear, comfy and lovely atmosphere for the metropolis.

Application Scope:
2600mm  Railway Tunnels Pipe Jacking Machine is also broadly utilised in underground drinking water pipe ,oil pipe ,nature fuel ,for trechless underground pipe laying projects, eg. sewage, h2o offer, discharging tasks, cables, tunnel,various conversation cable laying pipeline trenchless, This technologies isn’t going to need excavation surface ,it drive the pipe to the soil get started with star shaft,and it can curve ,overcome some underground pipeline obstacles.  

Principle
2600mm  Railway Tunnels Pipe Jacking Device design is trenchless (non-excavation)construction ,It is a non-excavation or much less excavation of the pipeline embed construction engineering.Pipe jacking design is in the operate in the pit by indicates of jacking gear which create jacking force, and get over the friction in between the pipes and the bordering soil
Jacking the pipes Into the soil at the design and style slope.and Removed soils ,
After a area of pipe complete jacking into the soil , then the next segment of the pipes carry on to jack into the soil , The theory is by means of the thrust of the primary cylinder    pipeline, intermediate jacking station,and other thrust pushing the device pipe or heading machine (through the soil )from working well to the acquiring nicely and Lift up. Then , embed the pipes amongst the two wells

 
Principal Characteristics: 
Applicable to a wide assortment of soil, soft soil, clay, sand, challenging soil, backfill soil.
With robust Crushing potential, crushing massive particle   
With impartial water injection, grouting technique
Jacking velocity is quick, the fastest jacking speed can reach 200mm per moment
Higher precision building, the higher and reduced, left and right deviation adjustment angle can reach 5.5 levels.
The use of floor centralized manage system, protected, intuitive and hassle-free.
one.NPD series Slurry  pipe-jacking tunneling equipment is suited to drill in gentle, clay, sandy, gravel soil, challenging soil,  and again fill . 
2. It has the edge of  stronger breaking capability, greater diameter of broken grain and far more quantities. 
three. It has impartial drinking water injection and grout injection technique.  
4. With quick press pace, it can get max speed 200mm per min. 
5. With substantial accuracy of design, it can rectify a deviation upper, decrease, remaining and right , and get max Deviation Adjustment Angle 5.5°
six. It adopts floor centralized manage program, which has  been safer, Intutive and more relaxed. 
 
Advantage
The mini-boring machine pushed CZPT by the primary cylinder,The dull head enters the water end ring, pass through the soil and get to the acquiring wells,The motor gives vitality to flip the reducing knife plate,Via reducing knife plate into the soil,Excavated soil, stones, and many others. are crushed by rotating chopping knife, then into the slurry tank , it is blended with the slurry, and ultimately via the slurry system of the sludge pipe ,transfer to the floor by the pump,In the excavation approach, the use of complicated muddy h2o harmony system to preserve soil and h2o balance, 
It Often in an active and passive earth strain this to eliminate the settlement and uplift of the floor.After the unexciting machine is totally in the soil.the Cable and slurry pipe is taken out. Right after Hanging the very first part of the pipe,it was pushed to the tail of the boring device, after connecting  ,Excavation stopped, the hydraulic gradually recovered.Another pipe into the effectively once more ,which was soon after the initial section of the pipe ,it connected jointly and re-jacking,This procedure is recurring until finally all the pipes are coated with soil,Comprehensive a long lasting underground pipeline.
 
Packaging & Delivery
Nude Packing
Delivery Detail:
60 times soon after thirty% deposit obtaining
 
Our Companies 
1.Following sales services:abroad commissioning engineer CZPT for tests and installation.
2.Working solutions:abroad commissioning functioning staff for entire pipe jacking construction. 
3.On web site service help
4 12month guarantee
five Daily life time support assistance,
6 Communicate by Web services, Phone, E mail, Skype and so forth.
7. 7 times*24hours Hot-line & Email Service. 
8.Your inquiry related to our pipe jacking device will be replied within 24 hours.Properly-trained and experienced staff will answer all your questions in fluent English.
 
 Warranty
If top quality & assembling issue brought on difficulties, we take dependable on spare components and all services expenses.
If misuse or human factors brought on the difficulty, customers shall get dependable on spare components and all service charges.
 
 Organization Info
ZheJiang Xuanxuan Large CZPT Co.Ltd is affiliated with Weiqiang Team.It’s located in HangCZPT metropolis,ZheJiang Province,is situated in the heart of the Yangtze River Delta,the north part shut to Yangtze River, the south component near to Lake Xihu (West Lake) Dis., and East part is near to the East China Sea.Is the birthplace of modern day Chinese industrial, present day tools producing town. It Has a exceptional geographical gain and convenient land and sea and airtransportation situations.
WeiQiang group was started in 1989,Far more than thirty many years of historical past, now,It Is made up of several businesses,this sort of as  Weiqiang Chemical, Weiqiang equipment,  XuanXuan weighty CZPT , it was assessed as “non-public engineering enterprises in HangCZPT CZPT”,”Substantial-tech enterprises in ZheJiang Province ” Private science and technological innovation enterprises in ZheJiang province “.
ZheJiang Xuan Xuan Large CZPT Co., Ltd. professional layout and manufacture trenchless engineering tools,integrate Merchandise development, producing, advertising and following-sales service .Merchandise consist of multi-collection pipe jacking machine, protect machine, pipe jacking gear and spare elements spare parts.
Items include multi-collection pipe jacking equipment, defend device, spare components of pipe jacking device, defend machine,CZPT oil cylinder, hydraulic technique, lubricating technique, pneumatic system, PLC handle program and non-regular equipment.The firm attaches fantastic value to the development of new technology and new goods.In current several years, In modern several years, vigorously invested in the non-excavation pipe jacking equipment, hydraulic methods, and had carried out a great deal of fruitful perform.It has successfully produced a slurry balance, earth force balance and collection of multi-sort excavation items,It has been  successful software in domestic marketplace,  
The company attaches wonderful relevance to solution quality administration, and establish a standardized and systematic top quality administration platform, stringent requirements, excellence, our goal is to supply buyers with large-high quality engineering gear.  Company will supply high-good quality pre-sale, sale, soon after-sales service,Organizations to give higher-good quality pre-sale, sale, following-revenue provider, At any time, provide solution consulting,   use  guidance, and so forth.
Adhering to the service functions of “active”, professional specialization, efficiency initial ” we aim to provide quality products and excellent service to our consumers. To attain the expectations of consumers and exceed objectives of Industry common.
Xuan Xuan hefty sector based on long-term growth method, adhere to the “conservation, protection, provider,” the 3S product notion, and vigorously market scientific and technological innovation, continuing to offer consumers with quality merchandise and solutions.
 
 FAQ
In order for you to get a better price tag and technological solutions. Remember to provide the subsequent required parameters:
1. Project total duration, length for a single area, how several sections will be created? 
2 Pipe sort: concrete or metal and many others, single duration of the pipe? outer and inner diameter ? 
 3 Projects details: for water source, sewage venture? 
 4 Underground h2o level 
 5 Soil type? soil report is required.
 

 

Driven by Ultrasonic Motor with High Performance Tbm